Platform · Energisation

Energise with the paperwork already done.

Notices of energisation raised per system, with the discipline worked out from the equipment, the prerequisite records listed, and every isolation recorded.

The problem
Energising early is a safety risk. Energising late is a schedule risk. Both come from not knowing, on the day, whether every check behind the notice has been signed.
Prepare

Raise the notice against a system or sub-system. Sigma works out the disciplines from its equipment.

Check

The check sheets and certificates the notice depends on are listed with their status.

Approve

Signed by the people your procedure names, in order.

Isolate

Permits to work and isolations recorded with lock numbers, who applied them and who removed them.

What you get

Energisation in Sigma

  • One notice per system, with its full history
  • Permits with holder, validity and conditions
  • Isolations applied and removed, each with a lock number
  • Competency checks before a signature is accepted
  • Everything kept for the handover record